邊坡支護(hù)-畢業(yè)設(shè)計(jì).docx

約68頁(yè)DOCX格式手機(jī)打開(kāi)展開(kāi)

邊坡支護(hù)-畢業(yè)設(shè)計(jì),摘要   本邊坡支護(hù)設(shè)計(jì)是作者以在郴州市三湖一公園(段家、上元組)拆遷安置小區(qū)西北側(cè)切方邊坡工程dg段工地收集的資料為基礎(chǔ),結(jié)合本科階段學(xué)習(xí)的理論知識(shí)和工地實(shí)習(xí)的現(xiàn)場(chǎng)實(shí)踐經(jīng)驗(yàn),根據(jù)相關(guān)文獻(xiàn)和規(guī)范完成。設(shè)計(jì)正文部分包括設(shè)計(jì)條件及其分析、設(shè)計(jì)依據(jù)及設(shè)計(jì)原則、邊坡支護(hù)工程方案論證及設(shè)計(jì)計(jì)算、施工組織設(shè)計(jì)和工程預(yù)算書(shū)等內(nèi)容。本...
編號(hào):15-304248大小:365.83K
分類(lèi): 論文>土木工程/建筑論文

內(nèi)容介紹

此文檔由會(huì)員 秋風(fēng)2013 發(fā)布

摘要
   本邊坡支護(hù)設(shè)計(jì)是作者以在郴州市三湖一公園(段家、上元組)拆遷安置小區(qū)西北側(cè)切方邊坡工程DG段工地收集的資料為基礎(chǔ),結(jié)合本科階段學(xué)習(xí)的理論知識(shí)和工地實(shí)習(xí)的現(xiàn)場(chǎng)實(shí)踐經(jīng)驗(yàn),根據(jù)相關(guān)文獻(xiàn)和規(guī)范完成。設(shè)計(jì)正文部分包括設(shè)計(jì)條件及其分析、設(shè)計(jì)依據(jù)及設(shè)計(jì)原則、邊坡支護(hù)工程方案論證及設(shè)計(jì)計(jì)算、施工組織設(shè)計(jì)和工程預(yù)算書(shū)等內(nèi)容。本文首先對(duì)邊坡的穩(wěn)定性進(jìn)行分析,判定了其穩(wěn)定程度,再根據(jù)巖土工程勘察報(bào)告和相關(guān)資料,通過(guò)分析論證,從幾種可行的方案中,選取最終的支護(hù)方案——格構(gòu)梁加錨桿支護(hù)。然后,進(jìn)行了格構(gòu)梁加錨桿支護(hù)的設(shè)計(jì)計(jì)算和分析調(diào)整,得出了本工程的設(shè)計(jì)結(jié)果。設(shè)計(jì)還進(jìn)行了詳實(shí)的施工組織設(shè)計(jì),制定出了一個(gè)比較合理、科學(xué)的施工方案,設(shè)計(jì)施工工期為60天。最后,編制了工程預(yù)算書(shū),計(jì)算出本程的工程預(yù)算總造價(jià)為約1608883.96元。
   
   關(guān)鍵詞:邊坡穩(wěn)定性分析;邊坡支護(hù)設(shè)計(jì);格構(gòu)梁加錨桿支護(hù)
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   Abstract
   This design is based on the material got from the DG section of the Cut side slope construction work site in the northwest of the Sanhuyi Resettlement Community in chenzhou, combined with the theoretical knowledge studied during undergraduate stage and the practical experience learnt from the construction side, according to relevant literature and criterions to complete. The main text of this paper including the design condition and its analysis, design basis and the principle of design, the feasibility studies of slope supporting schemes and its design, construction design and budget statement. In this paper, the stability of the slope is analyzed, then according to geotechnical engineering investigation report and relevant materials, through a series of analysis and demonstrates, from several feasible schemes select the optimum supporting scheme–Anchoring Net Beam Support. Then, introduces the design calculation and analysis of this supporting scheme.Next, conduct a detailed construction design and develop a reasonable and scientific construction plan, the construction period is 60 days. Finally, the budget of the project is given and the total estimated project cost is about 1608883.96 yuan.

Key words:slope stability analysis; retaining and protecting for slope; Anchoring Net Beam Support